STEEL, BLAST FURNACES AND FOUNDRIES
Processing Plant for Moulding Sand
Location
Tafalla / SPAIN
Scope
Mechanical assembly and electrical installation of a processing plant for moulding sand for a casting plant
- Bringing in and unpacking
- Mechanical assembly
- Electrical installation
- I/O-tests and rotational direction tests
Duration
8 Months
Challenges
Shortage in availability of equipment, as e.g. mobile cranes, required high flexibility in work preparation
Cut-off Grinding Plant
Location
Neunkirchen / GERMANY
Scope
Mechanical and electrical installation of a cut-off grinding line for billets in a steel plant
- Bringing in and unpacking
- Mechanical assembly
- Measuring and precision leveling
- Electrical installation
- Commissioning assistance
Duration
2 Months
Challenges
Assembly simultaneously to ongoing production process
Aluminium Plant
Location
Mezaieed / QATAR
Scope
Electrical installation of ship unloader and conveyor system for an aluminium plant
- Supply of electrical installation material
- Electrical installation
- Protective earthing
- I/O-tests and rotational irection tests
- Commissioning assistance
Duration
17 Months
Challenges
Climate conditions (temperatures up to 60° celsius, app. 90 % humidity)