OTHER INDUSTRIES
Deep Space Antenna
Location
Malargüe / ARGENTINA
Scope
Mechanical assembly of a deep space antenna
- Offloading, unpacking and positioning
- Welding
- Mechanical assembly
- Precision leveling
- Painting
- Commissioning assistance
Duration
21 Months
Challenges
- Shortage in availability of materials and equipment in the local market
- High flexibility in work preparation required
- Painting of the antenna by certified sport climbers
Air Cargo Logistics Centre
Location
Heathrow / GREAT BRITAIN
Scope
Mechanical assembly and electrical installation of an air cargo logistics centre at London-Heathrow airport
- Off-loading, unpacking and bringing in
- Positioning, precision leveling and fixing
- Measuring
- Electrical installation
- I/O tests
Duration
3 Months
Challenges
High security and safety requirements for site access (airport) along with electrical installation according to BS 7671