OTHER INDUSTRIES

Deep Space Antenna

Location
Malargüe / ARGENTINA

Scope
Mechanical assembly of a deep space antenna

  • Offloading, unpacking and positioning
  • Welding
  • Mechanical assembly
  • Precision leveling
  • Painting
  • Commissioning assistance


Duration
21 Months

Challenges

  • Shortage in availability of materials and equipment in the local market
  • High flexibility in work preparation required
  • Painting of the antenna by certified sport climbers

Air Cargo Logistics Centre

Location
Heathrow / GREAT BRITAIN

Scope
Mechanical assembly and electrical installation of an air cargo logistics centre at London-Heathrow airport

  • Off-loading, unpacking and bringing in
  • Positioning, precision leveling and fixing
  • Measuring
  • Electrical installation
  • I/O tests


Duration
3 Months

Challenges
High security and safety requirements for site access (airport) along with electrical installation according to BS 7671


Printing Machine

Location
Riyadh / KINGDOM of SAUDI ARABIA

Scope
Mechanical assembly of a printing machine

  • Bringing in and unpacking
  • Pre-assembly
  • Positioning and measuring
  • Commissioning assistance


Duration
2 Months

Challenges
Climate conditions (temperatures up to 50° celsius)


Contact
Telephone +1 678 679 4840
Fax +1 678 679 4841

office@wkamerica.com




Locations